Finished Brickwork!!
Here it is the finished brickwork all that mortar scraping was well worth it!
We have pointed with a traditional Lime based putty and it makes the brickwork jump out at you! For a wall that was never meant to be seen it doesn't look half bad, it is very in and out/ bumpy (yes that is a technical term) but it just looks amazing.
As you can probably tell we are very excited about it! The plumber is amazing, we have had a right result!, as you can see by the photo's the radiators are up ( he had them all up by the end of the 1st day!), all the pipework is in (Done on days two and three) and all that is left to do is install the boiler (he is there today so hopefully will have it done!)
As for the plasterer he has been to have a look and unfortunately can't get in till after the bank holiday, but he ensures me its only a couple of days work! and the wood is ordered for the floor so that will be down very soon!
We have the gas board in tomorrow (Wed 23rd) to connect the gas mains and then Powergen are coming to fit the meter on Thursday! We might even have central heating by the end of the week!!!!
I'll post some photo's tomorrow once it is all done! (hopefully! ;))